Paver Patio Cost Calculator: Materials, Labour and the Price per Square Foot

Enter the area and your local unit prices. The page prices the takeoff line by line, then adds the two labour lines so the DIY and hired numbers sit side by side instead of in different conversations.

Line-by-line takeoffDIY vs hiredYour prices, not oursCost per sq ft

The calculator

$4,422.47 · $23.03 per sq ft

192.0 sq ft · Running bond (stretcher, half offset)

Your measurements

What are you paving
ft
ft
sq ft

Paths, landings, a second terrace: add them here so the takeoff is one order.

ft
Paver and bond

Sizes are nominal inches; the thickness is the moulded thickness.

in
in
in
%

Rule of thumb for Running bond (stretcher, half offset): 5%. Yours to change.

Base and bedding

Sets the published minimum depth.

in

Tabulated minimum for this use: 4 in.

%

CMHA suggests +50% for each of weak soil, poor drainage and freezing. 0 keeps the tabulated minimum.

in

ICPI: 1 in uncompacted, screeded level.

ton/yd³

Typical crushed stone: 1.40. Ask your yard — this is the biggest lever on the tonnage.

ton/yd³

Typical concrete sand: 1.35. Supplier figure, editable.

Joint sand
cu ft

From your product’s bag. 0.5 cu ft is a 50 lb bag of sand; a binder-heavy bag fills less.

Your prices (examples, edit them)
$ each
$/ton
$/ton
$/bag
$/ft
$/sq ft
$/sq ft

Cost, line by line

192.0 sq ft (17.8 m²) · 16.0 x 12.0 ft · hired

Materials
$1,350.47$7.03 per sq ft
Labour
$2,304.00$12.00 per sq ft
Excavation
$768.00$4.00 per sq ft
Total
$4,422.47$23.03 per sq ft
LineQuantityAmount
Pavers847 pavers$719.95
Gravel base3.3 tons$182.52
Bedding sand0.8 tons$36.00
Polymeric joint sand5 bags$160.00
Edge restraint56 ft$252.00
Materials $1,350.47
Total$23.03 per sq ft$4,422.47

DIY against hired

ScopeTotalPer sq ft
Materials only (DIY)$1,350.47$7.03
Materials, labour and excavation$4,422.47$23.03
What the labour adds$3,072.00$16.00
  • Not included: sales tax, delivery, skip hire, tool rental and any drainage detail. Add them after the takeoff.

Every unit price is an example. Replace them with quotes and the total becomes a number you can take to a merchant.

Worked examples

Every number below comes from the same engine that runs in the browser, at build time, so the examples cannot drift from the calculator above.

192 sq ft, hired

Materials
$1,350.47
Labour and excavation
$3,072.00
Total
$4,422.47 · $23.03 per sq ft

The same patio as a DIY job

Total
$1,350.47 · $7.03 per sq ft
Saved
$0.00 of labour and excavation

A deeper base at 6 in

Base
5.0 tons · $273.78
Total
$4,513.73

Five material lines, because that is what a patio is made of

A paver patio costs what the pavers, the base, the bedding sand, the joint sand and the edge restraint cost, plus the labour to put them down and the excavation to make room. That is the whole bill of materials, and every line is a quantity you can check against a delivery ticket. Anything else on a quote — equipment, disposal, a skid steer for a day — is a line the contractor is entitled to charge and you are entitled to see.

Pricing the pavers by the each rather than by the square foot is the honest way to do it, because that is how they are sold. A 4 x 8 paver at $0.85 is $3.57 per square foot at 4.20 pavers per square foot; at $1.10 it is $4.62. The same paver in a different colour or from a different yard is a different number, which is why the form asks for the price rather than printing one.

The base is priced by the ton and the sand by the ton, and both are local products. The joint sand is priced by the bag because that is the retail unit, and the edge restraint by the linear foot. Five lines, five suppliers or one merchant, and the arithmetic is the same.

Cost per square foot is the only number that compares

A total price for a patio compares nothing: a 200 sq ft patio at $18 per sq ft and a 400 sq ft patio at $14 are not the same job and not the same value. Divide the total by the area and the numbers line up, then compare the same scope — same base depth, same pattern, same edge detail. A quote that looks cheap per square foot is often a 4 in base where the other quote has 6 in.

The form returns the materials total, the labour and excavation totals, and the price per square foot for both the DIY case and the hired case. The distance between them is what you are paying for: not just the laying, but the excavation, the disposal of the spoil, the compaction, the cuts, the setting out and the warranty.

On a straightforward patio, materials are usually a little over half of a hired price. On a patio with steps, curves and a lot of cuts, the labour share grows and the materials share barely moves — which is the pattern to look for when comparing two quotes for the same drawing.

DIY is a labour decision, not a materials decision

The materials cost the same whether you lay them or someone else does; what changes is the two labour lines. Excavation is the one people underestimate: a 12 x 12 patio at 7 3/8 in of build-up is 7.4 cu yd of spoil, which is a skip, a wheelbarrow and a weekend before a single paver is laid. On a driveway it is more than double that.

The tools are a real cost too, and the form does not add them: a plate compactor, a wet saw or a good disc cutter, a screed rail, a straightedge, a rubber mallet, knee pads. Renting them for a weekend is often cheaper than buying, and buying a cheap plate compactor is the classic false economy on a first patio.

What DIY buys is control and what it costs is time. A confident first-timer laying 4 x 8 pavers in running bond on a prepared base should plan on roughly a square metre an hour; a professional will do several times that. Multiply by your own hourly value before deciding the labour line is the expensive one.

What is in the total

Where budgets actually go wrong

The first overrun is the base depth. A quote priced on 4 in and a site that needs 6 in is 50% more stone and 50% more excavation, and it is not a small line. The second is the pattern: a herringbone at 45 degrees is a beautiful patio and a slow one, and the extra cuts show up in labour and in the waste allowance.

The third is the edge. A plastic edge restraint spiked into the base is cheap and adequate for a garden patio; a concrete curb is a different number, and on a driveway it is often the right one. The fourth is drainage: a patio that needs a channel drain or a soakaway is a plumbing job attached to a paving job.

The fifth is the one nobody quotes: the second delivery. Ordering 5% short on pavers means a second trip, a second delivery charge and possibly a dye-lot that does not match. The waste allowance in the takeoff is cheaper than the phone call.

These prices are examples, and they say so

Every unit price in this form starts at a round example number so the arithmetic is visible on first load. None of them is a survey, a national average or a quote, and the page does not pretend otherwise. A paver patio in one city costs twice what it costs in another for reasons that have nothing to do with the pavers.

The useful move is to replace the examples with your own numbers as you get them: a quote for the pavers, a price per ton from the quarry, the bag price at the merchant, the rental rate for the plate, and an hourly rate for your own time or the contractor’s. The total then means something, because every input came from a real quote.

What the page is good at is the comparison. Change the base depth from 4 to 6 in and watch the materials line move; switch the pattern to herringbone and watch the paver count and the labour assumption diverge; flip DIY and see exactly what the labour was going to cost. Those are the decisions that set the budget, and they are all visible here.

Questions about the budget

How much does a paver patio cost per square foot?

This site will not quote a national average, because there is no honest one: the paver, the base depth, the pattern and the local labour rate all move the number by a factor of two. The calculator prices your quantities at your unit prices and returns a cost per square foot you can defend, line by line.

Is it cheaper to lay pavers yourself?

The materials cost the same; you save the labour and excavation lines and spend your own time plus tool rental and skip hire. On a simple patio the saving is real; on a driveway with a concrete curb and a lot of cuts, the tools and the risk often close the gap.

How much does the base add to the cost?

At 4 in, a 144 sq ft patio needs 1.8 cu yd of base, about 2.5 tons. At 6 in it is 2.7 cu yd and 3.7 tons. Multiply by your quarry’s price per ton and add the excavation: the base is usually a bigger share of the materials than people expect, and the first place a cheap quote is cheap.

What is usually missing from a paver quote?

Excavation and spoil disposal, a compaction specification, the edge restraint detail, drainage, and the waste allowance. A quote that lists pavers and labour but not the depth of base or the edge is a quote you cannot compare with one that does.

Do I need to add tax and delivery?

Yes, and the form does not. Sales tax, delivery charges and the skip are separate lines on a real invoice, and on a small patio they can be a noticeable share of the total. Add them after the takeoff rather than pretending they are in it.

Every number this site asserts, and where it came from

ValueAs used hereBasisSource
Bedding sand thickness1 in (25 mm) uncompactedScreeded to a constant nominal thickness; the sand is not there to fix an uneven base.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Bedding sand specificationASTM C33 or CSA A23.1 FA1, ≤1% passing No. 200Washed concrete sand; masonry sand, limestone screenings and stone dust are explicitly excluded.CMHA / ICPI PAV-TEC-017 — Bedding Sand Selection for Interlocking Concrete Pavements
Base depth, pedestrian4 in (100 mm) compactedSidewalks, patios and pedestrian areas over well-drained soil; thicker for weak, wet or freezing ground.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Base depth, residential driveway6 in (150 mm) compactedSame bulletin for cars and light trucks; the CMHA base article repeats it and adds 50% per poor site condition.CMHA — Proper Concrete Paver Base and Depth
Base depth, residential street8 in (200 mm) compactedParking lots and residential streets; industrial pavements are designed, not tabulated.CMHA — Proper Concrete Paver Base and Depth
Minimum surface slope1.5% (about 3/16 in per ft)ICPI states 1.5% minimum, and 1% longitudinal / 2% cross-slope for roads; this site defaults to 2%.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Joint sand materialASTM C144 mason sand or polymeric sandICPI allows ASTM C33 concrete sand too, but notes it is harder to sweep into the joints.CMHA / ICPI PAV-FAQ-002 — Installing Standard Interlocking Concrete Pavers
Polymeric sand depthjoint filled to 1/8 in (3 mm) below the topManufacturer instruction; on a repair the old sand comes out at least 1.5 in deep.Alliance Gator — polymeric jointing material FAQ
Joint sand stabilizer thresholdrecommended above 7% slopeICPI names high-slope applications as one of the cases where stabilizer is worth it; optional otherwise.CMHA / ICPI PAV-TEC-005 — Cleaning, Sealing and Joint Sand Stabilization
Base compaction4–6 in lifts, 98% standard ProctorICPI: 7,000 lbf reversible plate for 4–6 in lifts, thinner lifts for a 5,000 lbf machine; ASTM D698 density.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Bagged sand sold by volume0.5 cu ft per bagThe retail hardscape sands are sold in 0.5 cu ft bags and priced by depth; a 1 cu ft bag is a different product.QUIKRETE quantity calculators — hardscape sands
Aggregate and sand tonnagetons = cubic yards × densityEditable in the form. 1.40 short tons per cu yd for crushed base and 1.35 for sand are typical supplier figures, not a spec — ask your yard.CMHA — Proper Concrete Paver Base and Depth
Paver thickness by use2 3/8 in pedestrian, 3 1/8 in streets60 mm and 80 mm units; both are editable because makers sell 2 3/4 in and 3 1/8 in variants.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Edge restraintat least 1 in of vertical face on the paverICPI minimum restraining surface; more for heavy-duty applications.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements

Sources

This is an estimating tool. The product label, the paver manufacturer’s installation guide and your local building department decide the detail on your site — the numbers here are a starting point, and every price is an example you are expected to change.