16 ft run at 1/4 in per foot
- Fall
- 4" (2.08%)
- Low end
- 7 3/8"
- High end
- 11 3/8"
JoyOne factory · hardscape takeoff
A patio needs to fall away from the building, and the fall is a number: inches per foot, or percent, over the run you are paving. This page returns the total drop and the depth to dig at each end.
4" fall · 2.08% · high end 11 3/8"
144.0 sq ft · Running bond (stretcher, half offset)
16.0 ft run at 0.25 in per foot
| Unit | Value | Check |
|---|---|---|
| Inches per foot | 0.25 in/ft | The number a level and a straightedge give you |
| Percent | 2.08% | in/ft ÷ 12 × 100 |
| Total fall | 4" | 0.25 in/ft × 16.0 ft |
| High-end excavation | 11 3/8" | build-up plus fall |
| Stabilizer | Optional | ICPI: stabilizer above 7% slope |
Set out to the top of the paver, not the top of the sand, and carry the same fall through the subgrade, the base and the bedding.
Every number below comes from the same engine that runs in the browser, at build time, so the examples cannot drift from the calculator above.
ICPI’s construction bulletin says slopes should be a minimum of 1.5%. On a road it is more specific: 1% longitudinally and 2% across. For a patio against a house, 2% — 1/4 in per foot — is the common residential target, because it drains reliably without the surface feeling like a ramp underfoot.
The direction matters as much as the number. Water has to leave the paving and it has to leave away from the building. A patio that falls towards the house at 4% is worse than one that falls away at 1.5%, and a patio that falls to a wall with no outlet is a pond with pavers in it.
The calculator flags anything under 1.5%. That is not a building-code failure; it is the published minimum for drainage, and a patio below it will hold water in the low spots and grow moss in the joints. If your site cannot achieve 1.5% because of an existing step or threshold, the answer is a drain, not a flatter patio.
A slope of 1/4 in per foot is 2%, because a quarter of an inch in twelve is 2.08%. A slope of 1/8 in per foot is about 1%, and 1.5% is 0.18 in per foot — near enough to 3/16 in that most builders set 3/16 in per foot and call it the minimum. The form accepts either and shows both, so a plan that says 2% and a level that reads 1/4 in per foot are the same instruction.
Total fall is the slope times the run. A 16 ft run at 1/4 in per foot falls 4 in. The same 16 ft at 1.5% falls 2 7/8 in. That is the number to check against the door threshold, the air brick and the damp course on the wall the patio meets.
The conversion is worth having in your head because the units get mixed on drawings: 1% is 1/8 in per foot, 2% is 1/4 in per foot, 5% is 5/8 in per foot, and 7% is about 7/8 in per foot. The last one matters because ICPI recommends joint sand stabilizer above 7% — steep paving loses its joint sand to water and to feet.
On a sloping patio the high end is dug deeper than the low end, by exactly the total fall. If the build-up is 7 3/8 in — 2 3/8 in paver, 1 in bedding, 4 in base — the low end is dug to 7 3/8 in below the finished surface and the high end to 11 3/8 in. Getting this wrong at one end is how a patio ends up with a base that is 2 in thicker at the house, which then settles differently.
The build-up number itself comes from the layers, and the base depth from what the pavement is for. A driveway at 6 in of base with the same paver and bedding is 9 3/8 in at the low end before any fall. That is the depth the dig has to reach, and it is worth pegging the finished surface height on the wall before the first spade goes in.
The surface you set out is the top of the paver, not the top of the sand. Setting out to the sand and adding the paver height afterwards is how a patio finishes 2 3/8 in above the damp course. Peg the finish, work down through the layers, and check the fall with a line rather than by eye.
Sheet flow off a patio needs somewhere to go: a garden, a gravel strip, a soakaway or a drain. A patio that falls to a lawn is usually fine; a patio that falls to a boundary wall with a neighbour’s ground higher than yours is a drainage problem wearing a paving hat. The slope calculator tells you the fall, not whether the outlet exists.
On steep paving, joint sand is the first thing to fail. ICPI recommends a joint sand stabilizer on slopes over 7%, and it also lists concentrated water flows — gutters, downspout drip lines — as places where stabilizer earns its cost. The alternative is topping up the joints every spring.
The base needs to follow the fall, not fight it. If the subgrade is level and the finished surface falls 4 in, the base is 4 in thicker at one end, and unless it is compacted in lifts the thick end is the loose end. The correct order is subgrade to the fall, base to the fall, bedding screeded to the fall — one slope, carried through the section.
Every inch of fall is an inch of extra excavation at the high end and an inch of extra base. On a 300 sq ft patio, 4 in of fall at one end adds about 1.9 cu yd of spoil and the same volume of extra stone if the low end is held — which is why the excavation depth is worth calculating before the dig rather than discovering it with a skip on the drive.
The detail at the house end is where slope meets construction. The paving should finish below the damp course, with a gap or a drainage detail so water does not sit against the wall, and the fall should start at the wall rather than 2 ft away from it. A patio that is level for the first 2 ft and then falls is a patio with a puddle against the house.
And the edge restraint has to cope with the slope. A plastic edge on a 2% fall is fine; on a steep driveway it needs pinning more often and the restraint itself has to be set to the fall, not level. The restraint is the line the whole surface is screeded from, so if it is wrong the pavers are wrong.
ICPI states a minimum of 1.5%, which is about 3/16 in per foot. Two percent — 1/4 in per foot — is the usual residential target because it drains reliably. The slope must run away from the building, not merely exist.
Four inches. Sixteen feet times 0.25 in per foot is 4 in, which is 2.08% — the same slope expressed as a percentage. At the 1.5% minimum the same run falls 2 7/8 in.
Multiply the percent by 12 and divide by 100. Two percent is 0.24 in per foot, which is why 1/4 in per foot is used as the same instruction. One percent is 0.12 in per foot, near enough to 1/8 in.
The build-up plus the total fall. A 2 3/8 in paver, 1 in of bedding and 4 in of base is 7 3/8 in; with a 4 in fall over the run the high end is 11 3/8 in deep. The low end stays at the build-up depth.
Only where water cannot leave by gravity: against a wall with no outlet, below an existing threshold, or where the fall would otherwise be under 1.5%. A channel drain or a soakaway is a designed detail, not something a slope calculator can size.
| Value | As used here | Basis | Source |
|---|---|---|---|
| Bedding sand thickness | 1 in (25 mm) uncompacted | Screeded to a constant nominal thickness; the sand is not there to fix an uneven base. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Bedding sand specification | ASTM C33 or CSA A23.1 FA1, ≤1% passing No. 200 | Washed concrete sand; masonry sand, limestone screenings and stone dust are explicitly excluded. | CMHA / ICPI PAV-TEC-017 — Bedding Sand Selection for Interlocking Concrete Pavements |
| Base depth, pedestrian | 4 in (100 mm) compacted | Sidewalks, patios and pedestrian areas over well-drained soil; thicker for weak, wet or freezing ground. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Base depth, residential driveway | 6 in (150 mm) compacted | Same bulletin for cars and light trucks; the CMHA base article repeats it and adds 50% per poor site condition. | CMHA — Proper Concrete Paver Base and Depth |
| Base depth, residential street | 8 in (200 mm) compacted | Parking lots and residential streets; industrial pavements are designed, not tabulated. | CMHA — Proper Concrete Paver Base and Depth |
| Minimum surface slope | 1.5% (about 3/16 in per ft) | ICPI states 1.5% minimum, and 1% longitudinal / 2% cross-slope for roads; this site defaults to 2%. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Joint sand material | ASTM C144 mason sand or polymeric sand | ICPI allows ASTM C33 concrete sand too, but notes it is harder to sweep into the joints. | CMHA / ICPI PAV-FAQ-002 — Installing Standard Interlocking Concrete Pavers |
| Polymeric sand depth | joint filled to 1/8 in (3 mm) below the top | Manufacturer instruction; on a repair the old sand comes out at least 1.5 in deep. | Alliance Gator — polymeric jointing material FAQ |
| Joint sand stabilizer threshold | recommended above 7% slope | ICPI names high-slope applications as one of the cases where stabilizer is worth it; optional otherwise. | CMHA / ICPI PAV-TEC-005 — Cleaning, Sealing and Joint Sand Stabilization |
| Base compaction | 4–6 in lifts, 98% standard Proctor | ICPI: 7,000 lbf reversible plate for 4–6 in lifts, thinner lifts for a 5,000 lbf machine; ASTM D698 density. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Bagged sand sold by volume | 0.5 cu ft per bag | The retail hardscape sands are sold in 0.5 cu ft bags and priced by depth; a 1 cu ft bag is a different product. | QUIKRETE quantity calculators — hardscape sands |
| Aggregate and sand tonnage | tons = cubic yards × density | Editable in the form. 1.40 short tons per cu yd for crushed base and 1.35 for sand are typical supplier figures, not a spec — ask your yard. | CMHA — Proper Concrete Paver Base and Depth |
| Paver thickness by use | 2 3/8 in pedestrian, 3 1/8 in streets | 60 mm and 80 mm units; both are editable because makers sell 2 3/4 in and 3 1/8 in variants. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Edge restraint | at least 1 in of vertical face on the paver | ICPI minimum restraining surface; more for heavy-duty applications. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
This is an estimating tool. The product label, the paver manufacturer’s installation guide and your local building department decide the detail on your site — the numbers here are a starting point, and every price is an example you are expected to change.