Paver Sand Calculator: Bedding Sand and Joint Sand, Kept Separate

Two sands, two jobs, two answers. Enter the area and paver size once and the page returns the bedding layer in tons and bags, then the joint sand as a volume with a bag count you can match to your product.

1 in bedding layerJoint volume, not a guessASTM C33 beddingEditable bag yield

The calculator

24 bedding bags · 4 joint bags

144.0 sq ft · Running bond (stretcher, half offset)

Your measurements

What are you paving
ft
ft
sq ft

Paths, landings, a second terrace: add them here so the takeoff is one order.

ft
Paver and bond

Sizes are nominal inches; the thickness is the moulded thickness.

in
in
in
%

Rule of thumb for Running bond (stretcher, half offset): 5%. Yours to change.

Base and bedding

Sets the published minimum depth.

in

Tabulated minimum for this use: 4 in.

%

CMHA suggests +50% for each of weak soil, poor drainage and freezing. 0 keeps the tabulated minimum.

in

ICPI: 1 in uncompacted, screeded level.

ton/yd³

Typical crushed stone: 1.40. Ask your yard — this is the biggest lever on the tonnage.

ton/yd³

Typical concrete sand: 1.35. Supplier figure, editable.

Joint sand
cu ft

From your product’s bag. 0.5 cu ft is a 50 lb bag of sand; a binder-heavy bag fills less.

Bedding sand and joint sand

144.0 sq ft (13.4 m²) · 12.0 x 12.0 ft

Bedding sand
0.6 tons0.44 yd³ · 24 bags
Bedding depth
1"uncompacted, screeded · 12.00 cu ft
Joint length
605 ft3/16" joints in 8" x 4" pavers
Joint fill
1.77 cu ftdepth 2 1/4" = paver less 1/8 in
Joint sand bags
4at 0.50 cu ft per bag
SandSpecification to ask forJob here
BeddingASTM C33 / CSA A23.1 concrete sand, at most 1% passing No. 20024 bags or 0.6 tons
Joints, plainASTM C144 mason sandsame volume, no binder
Joints, polymericProduct with a printed coverage chart1.77 cu ft of joint fill
  • Sweep polymeric sand to 1/8 in below the top of the paver, then activate it exactly as the bag says. A joint filled to the top cures as a haze on the surface.
  • The bag’s coverage chart beats this page whenever the chart covers your joint width and paver size — it knows the product, this page knows the geometry.

Masonry sand, limestone screenings and stone dust are not bedding sand: ICPI excludes them because the fines stop the layer draining.

Worked examples

Every number below comes from the same engine that runs in the browser, at build time, so the examples cannot drift from the calculator above.

144 sq ft, 4 x 8 pavers, 3/16 in joints

Bedding
12.00 cu ft · 24 bags
Joint length
605 ft
Joint fill
1.77 cu ft · 4 bags

The same area in 12 x 12 slabs

Joint length
279 ft
Joint fill
0.82 cu ft · 2 bags
Why less
Four times the area per paver, so about half the joint per square foot.

Wider 1/4 in joints

Joint fill
2.31 cu ft
Bags
5

Two sands, two jobs, two specifications

The sand under the pavers and the sand between them are different materials doing different work. The bedding layer is a 1 in (25 mm) uncompacted screed of concrete sand that beds the pavers and lets them interlock; the joint sand fills the vertical gap between pavers and locks the surface. ICPI specifies ASTM C33 or CSA A23.1 concrete sand for the bedding layer and ASTM C144 mason sand or a polymeric product for the joints.

The bedding sand is not a levelling compound. ICPI is blunt about it: the sand is screeded to a constant nominal thickness and if the base is uneven the sand must not be used to compensate, because it will settle differentially and the surface will follow. A base that is 1/2 in out is a base to fix, not a bed to build up.

The joint sand is finer because it has to enter a 1/8 to 1/4 in gap. ICPI notes that ASTM C33 concrete sand can be used in joints but is harder to work in than a finer sand. Polymeric sand is the same idea with a binder: it fills the joint, then sets, and the surface resists washing and weed growth.

Stone dust is not bedding sand

Limestone screenings and stone dust are sold as a bedding material in some yards and they are the wrong product. ICPI’s construction bulletin excludes them by name, alongside masonry sand. The reason is in the fines: a bedding layer needs a graded concrete sand with no more than 1% passing the No. 200 sieve, so water can move through it and it does not turn into a slurry under load.

A bedding layer that holds water is a bedding layer that pumps. Under a vehicle the saturated fines migrate, the layer thins where the wheel passes and thickens where it does not, and the paver settles into the rut. That failure is not the paver’s fault, and no amount of joint sand fixes it.

The practical check is a squeeze test and the ticket. Damp sand should hold together and break apart without smearing; the delivery ticket should name the spec. If the yard cannot say whether the sand is C33 concrete sand, that is the answer about whether it belongs under a driveway.

The bedding number is a volume, so the depth is the whole story

Area times 1 in divided by 12 is the volume in cubic feet — one cubic foot per 12 sq ft. A 144 sq ft patio is exactly 12 cu ft, 0.44 cu yd, and at 1.35 tons per cubic yard about 0.6 tons. That is a small pile: the bedding layer is not where a paving budget goes, which is why it is tempting to be casual about it and why being casual is a false economy.

The 1 in is uncompacted. After the pavers are laid and compacted, the bedding layer is thinner — around 3/4 in — but you buy the uncompacted number, exactly as a screed of soil is bought loose. Ordering the compacted thickness leaves every paver sitting low against the edge restraint.

The bag count follows from the bag. Retail hardscape sands are sold in 0.5 cu ft bags, so 12 cu ft is 24 bags, and a yard sells the same material by the ton for a fraction of the bag price. The form shows both because both are legitimate: bags for a landing, bulk for a patio.

Joint sand is a volume between pavers, not a percentage of area

The amount of joint sand depends on how much joint there is, which depends on the paver size, the joint width and the joint depth. Each paver owns one length plus one width of joint centreline: a 4 x 8 paver owns 12 in, a 12 x 12 paver owns 24 in, but a 12 x 12 paver covers four times the area, so the small paver has about twice the joint length per square foot.

Depth is the paver thickness minus 1/8 in, because the sand is meant to sit just below the top of the paver, not flush with it. A 2 3/8 in paver therefore takes 2 1/4 in of joint fill. The calculator multiplies joint width, joint depth and total joint length and reports cubic feet, which is the unit on a bag’s coverage chart.

This is why a bag of polymeric sand covers 40 sq ft on one job and 80 on another with the same pavers: the joint width and the paver thickness both changed. Any single “sq ft per bag” figure is a special case of the chart, not a constant.

What changes the joint sand

Polymeric sand: read the bag, then use the number here as a cross-check

Polymeric sand is installed at the full joint depth less 1/8 in (3 mm) below the top of the paver, and on a repair the old sand comes out at least 1.5 in deep. Those two instructions come from the manufacturer and they are the part most often done wrong: filling a joint to the top means the sand sits proud, gets walked onto the surface and cures as a haze.

Every product prints a coverage chart keyed to joint width and paver size, and the charts differ because the products differ — a stabilized sand with a binder is not the same density as a plain kiln-dried sand. This page therefore computes the joint volume and converts it at a bag yield you enter, defaulting to 0.5 cu ft per 50 lb bag. If your product’s chart covers your joint width, use the chart: it knows things a geometry model does not.

Water is the other variable. Polymeric sand needs to be watered to activate, and over-watering washes the binder out while under-watering leaves a loose joint. The manufacturer’s instruction — a specific area, a specific time, until the joint is saturated — is the one to follow, and it is worth reading before the bag is open rather than after.

Questions about bedding and joint sand

How much bedding sand do I need for 100 square feet?

At the ICPI 1 in uncompacted layer it is 8.3 cu ft, about 0.31 cu yd or 0.42 tons at 1.35 tons per cubic yard. In 0.5 cu ft bags that is 17 bags. A 144 sq ft patio is 12 cu ft, 0.44 cu yd, about 0.6 tons or 24 bags.

What kind of sand goes under pavers?

ASTM C33 or CSA A23.1 concrete sand — washed, sharp, with no more than 1% passing the No. 200 sieve. Masonry sand, limestone screenings and stone dust are explicitly not bedding sand, and a bedding layer with too many fines holds water and pumps under load.

How much joint sand do I need?

Work out the joint volume, not a percentage of the area: joint width x joint depth x total joint length. A 144 sq ft patio in 4 x 8 pavers with 3/16 in joints and 2 3/8 in thickness is about 1.9 cu ft of joint fill, which at 0.5 cu ft per bag is four bags. Your product’s chart may want fewer.

Can I use regular sand in the joints instead of polymeric?

Yes — ICPI allows ASTM C144 mason sand, and even C33 concrete sand with more effort. What plain sand does not do is bind: it can wash out, blow out and grow weeds, so it needs topping up. Polymeric sand trades that maintenance for a product that has to be installed to its own instructions.

Why is my polymeric sand not hardening?

The usual causes are under-watering, applying in cold or damp conditions, or a joint that was filled too deep or too shallow. The manufacturer’s activation instruction is specific for a reason: enough water to saturate the joint, not enough to wash it out. A joint filled to the top also cures poorly because the surface cannot be protected by the paver.

Every number this site asserts, and where it came from

ValueAs used hereBasisSource
Bedding sand thickness1 in (25 mm) uncompactedScreeded to a constant nominal thickness; the sand is not there to fix an uneven base.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Bedding sand specificationASTM C33 or CSA A23.1 FA1, ≤1% passing No. 200Washed concrete sand; masonry sand, limestone screenings and stone dust are explicitly excluded.CMHA / ICPI PAV-TEC-017 — Bedding Sand Selection for Interlocking Concrete Pavements
Base depth, pedestrian4 in (100 mm) compactedSidewalks, patios and pedestrian areas over well-drained soil; thicker for weak, wet or freezing ground.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Base depth, residential driveway6 in (150 mm) compactedSame bulletin for cars and light trucks; the CMHA base article repeats it and adds 50% per poor site condition.CMHA — Proper Concrete Paver Base and Depth
Base depth, residential street8 in (200 mm) compactedParking lots and residential streets; industrial pavements are designed, not tabulated.CMHA — Proper Concrete Paver Base and Depth
Minimum surface slope1.5% (about 3/16 in per ft)ICPI states 1.5% minimum, and 1% longitudinal / 2% cross-slope for roads; this site defaults to 2%.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Joint sand materialASTM C144 mason sand or polymeric sandICPI allows ASTM C33 concrete sand too, but notes it is harder to sweep into the joints.CMHA / ICPI PAV-FAQ-002 — Installing Standard Interlocking Concrete Pavers
Polymeric sand depthjoint filled to 1/8 in (3 mm) below the topManufacturer instruction; on a repair the old sand comes out at least 1.5 in deep.Alliance Gator — polymeric jointing material FAQ
Joint sand stabilizer thresholdrecommended above 7% slopeICPI names high-slope applications as one of the cases where stabilizer is worth it; optional otherwise.CMHA / ICPI PAV-TEC-005 — Cleaning, Sealing and Joint Sand Stabilization
Base compaction4–6 in lifts, 98% standard ProctorICPI: 7,000 lbf reversible plate for 4–6 in lifts, thinner lifts for a 5,000 lbf machine; ASTM D698 density.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Bagged sand sold by volume0.5 cu ft per bagThe retail hardscape sands are sold in 0.5 cu ft bags and priced by depth; a 1 cu ft bag is a different product.QUIKRETE quantity calculators — hardscape sands
Aggregate and sand tonnagetons = cubic yards × densityEditable in the form. 1.40 short tons per cu yd for crushed base and 1.35 for sand are typical supplier figures, not a spec — ask your yard.CMHA — Proper Concrete Paver Base and Depth
Paver thickness by use2 3/8 in pedestrian, 3 1/8 in streets60 mm and 80 mm units; both are editable because makers sell 2 3/4 in and 3 1/8 in variants.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements
Edge restraintat least 1 in of vertical face on the paverICPI minimum restraining surface; more for heavy-duty applications.CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements

Sources

This is an estimating tool. The product label, the paver manufacturer’s installation guide and your local building department decide the detail on your site — the numbers here are a starting point, and every price is an example you are expected to change.