605 pavers, 4 x 8 x 2 3/8 in
- One paver
- 6.16 lb
- Order
- 3,916.1 lb · 1.96 tons
- Trips
- 3 at 1,500 lb
JoyOne factory · hardscape takeoff
Volume times density gives the weight of one paver, the count gives the order, and your payload gives the number of trips. Useful before you agree to collect 600 pavers in a hatchback.
3,916.1 lb · 1.96 tons · 3 trips
144.0 sq ft · Running bond (stretcher, half offset)
636 pavers · weight only
| Check | Value | Note |
|---|---|---|
| Volume of one paver | 0.04 cu ft | length × width × thickness ÷ 1728 |
| Weight of one paver | 6.16 lb | volume × density |
| Pallet count | not set | Enter the pavers per pallet printed on the bundle to get a pallet count. |
| Trips | 3 | rounded up; a 95% load leaves no room for a passenger |
Density is a default, not a specification. If the bundle prints a weight, type it in and this page will use it instead.
Every number below comes from the same engine that runs in the browser, at build time, so the examples cannot drift from the calculator above.
A concrete paver weighs what its volume says it weighs, and concrete is around 140 lb per cubic foot. A 4 x 8 x 2 3/8 in paver is 76 cu in, which is 0.044 cu ft, so about 6.2 lb. A 12 x 12 x 2 3/8 in paver is 342 cu in, 0.198 cu ft, about 27.7 lb — one slab is a two-handed lift and a stack of them is a delivery.
The density is a default, not a law. Concrete mix design, the aggregate and the curing all move it by a few percent, and some pavers are deliberately denser. If the maker prints a weight per paver or per pallet, use it: the form takes an override for exactly that reason, and the printed figure is always better than a calculated one.
The thickness matters more than people expect because it is the smallest dimension but it multiplies everything. Going from 2 3/8 to 3 1/8 in is 32% more concrete per paver and 32% more weight for the same area, which is one reason the 80 mm unit is a driveway product and not a patio default.
Pavers are delivered on pallets, and the count per pallet is a manufacturer decision: 4 x 8 pavers might come 300 or 480 to a pallet depending on the maker and the pack pattern, and a pallet of 12 x 12 slabs is a different number again. The form asks for the count on the bundle rather than assuming one, because assuming is how a delivery arrives on three pallets instead of four.
A pallet also has its own weight limit, and a forklift or a pallet truck has to be able to move it. A pallet of 480 4 x 8 pavers is about 3,000 lb, which is a forklift job; a pallet of 300 is about 1,860 lb, which a pallet truck will move on a hard surface. Ask what the delivery vehicle can put down and where.
The weight per pallet is the number to give a builder or a driver. The form shows the count, the weight of the order and the number of pallets, so the conversation starts from the same figures.
A half-ton pickup is named for half a short ton of payload, which is 1,000 lb — and that payload includes the driver, the passenger and anything else in the cab or the bed. Two adults and a full tank can eat 400 lb of it before a single paver goes in. The form defaults to 1,500 lb as a round example, and you should replace it with the door-jamb sticker figure for your vehicle.
A trailer changes the arithmetic: the pavers go on the trailer, but the tongue weight lands on the tow vehicle as payload, and the trailer’s gross weight is its own limit. For a heavy order, the honest options are a delivery, a trailer with a rated gross weight, or more trips.
Tyre load rating and axle limits are the other half of the question. A vehicle can be within its payload number and still overload an axle if the weight sits at the tailgate. Load over the axle, strap it, and if the number in the form says three trips, take three.
What the trip count depends on
A paver order is a dead load on the base and the subgrade, and it is small next to the live load a driveway sees. Six hundred 4 x 8 pavers are about 3,700 lb over 144 sq ft, which is 26 lb per square foot — nothing compared with the point load of a car wheel or the design load of a building.
That is why the base depth is set by traffic and soil, not by paver weight. It is also why a stack of spare pallets left in the corner of a finished patio is worth thinking about: three pallets is a tonne sitting on four square feet, and a patio is not designed for a tonne in one spot.
Where weight matters structurally is handling and transport: the pallet, the lift, the axle and the delivery. Keep those numbers separate from the pavement design, and use this page for the handling side.
If you have one paver in the garden and no specification, weigh it. A bathroom scale and a steady hand is accurate enough: 6.2 lb against 5.9 lb changes a 600-paver order by 180 lb, which is a passenger, not a trip. What matters is not being out by a factor of two, and a factor of two only happens when the density assumption is wrong by a factor of two, which it is not.
The other useful measurement is the pallet. A pallet that a maker says is 300 pavers and a bathroom scale says is 1,900 lb is a density of about 6.3 lb per paver, which confirms the 140 lb per cubic foot figure for a 60 mm paver. If it comes out at 2,400 lb, either the count is wrong or the pavers are thicker than you think.
And if the answer is that the order needs four trips, the cheapest fix is usually delivery rather than a fourth trip. The fuel, the time and the risk of chipping a pallet on and off a trailer are worth more than the delivery charge on any order large enough to need the calculation.
About 6.2 lb at 2 3/8 in thick and 140 lb per cubic foot of concrete: 4 x 8 x 2.375 in is 76 cu in, 0.044 cu ft, times 140. A 3 1/8 in version of the same paver is about 8.2 lb. If the maker prints a weight, use theirs.
It depends on the count and the paver. 300 4 x 8 x 2 3/8 pavers is about 1,860 lb; 480 of the same is about 2,975 lb. Ask for the count per pallet and multiply by the weight of one paver; the form does it the other way round.
A half-ton is rated for about 1,000 lb of payload including passengers and fuel, so a realistic load is 600 to 800 lb — roughly 100 to 130 4 x 8 pavers. That is why most patio orders arrive on a delivery rather than in a pickup bed.
Not in any way that changes a domestic detail. 600 pavers are about 26 lb per square foot spread over the patio, and the base is sized for traffic and soil, not for the paving. Handling and transport are where the weight matters.
Within a few percent for concrete pavers, which is enough for transport and handling. It is not enough to certify a load: the maker’s printed weight per pallet and a weighbridge are the accurate answers, and the form takes the printed figure as an override.
| Value | As used here | Basis | Source |
|---|---|---|---|
| Bedding sand thickness | 1 in (25 mm) uncompacted | Screeded to a constant nominal thickness; the sand is not there to fix an uneven base. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Bedding sand specification | ASTM C33 or CSA A23.1 FA1, ≤1% passing No. 200 | Washed concrete sand; masonry sand, limestone screenings and stone dust are explicitly excluded. | CMHA / ICPI PAV-TEC-017 — Bedding Sand Selection for Interlocking Concrete Pavements |
| Base depth, pedestrian | 4 in (100 mm) compacted | Sidewalks, patios and pedestrian areas over well-drained soil; thicker for weak, wet or freezing ground. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Base depth, residential driveway | 6 in (150 mm) compacted | Same bulletin for cars and light trucks; the CMHA base article repeats it and adds 50% per poor site condition. | CMHA — Proper Concrete Paver Base and Depth |
| Base depth, residential street | 8 in (200 mm) compacted | Parking lots and residential streets; industrial pavements are designed, not tabulated. | CMHA — Proper Concrete Paver Base and Depth |
| Minimum surface slope | 1.5% (about 3/16 in per ft) | ICPI states 1.5% minimum, and 1% longitudinal / 2% cross-slope for roads; this site defaults to 2%. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Joint sand material | ASTM C144 mason sand or polymeric sand | ICPI allows ASTM C33 concrete sand too, but notes it is harder to sweep into the joints. | CMHA / ICPI PAV-FAQ-002 — Installing Standard Interlocking Concrete Pavers |
| Polymeric sand depth | joint filled to 1/8 in (3 mm) below the top | Manufacturer instruction; on a repair the old sand comes out at least 1.5 in deep. | Alliance Gator — polymeric jointing material FAQ |
| Joint sand stabilizer threshold | recommended above 7% slope | ICPI names high-slope applications as one of the cases where stabilizer is worth it; optional otherwise. | CMHA / ICPI PAV-TEC-005 — Cleaning, Sealing and Joint Sand Stabilization |
| Base compaction | 4–6 in lifts, 98% standard Proctor | ICPI: 7,000 lbf reversible plate for 4–6 in lifts, thinner lifts for a 5,000 lbf machine; ASTM D698 density. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Bagged sand sold by volume | 0.5 cu ft per bag | The retail hardscape sands are sold in 0.5 cu ft bags and priced by depth; a 1 cu ft bag is a different product. | QUIKRETE quantity calculators — hardscape sands |
| Aggregate and sand tonnage | tons = cubic yards × density | Editable in the form. 1.40 short tons per cu yd for crushed base and 1.35 for sand are typical supplier figures, not a spec — ask your yard. | CMHA — Proper Concrete Paver Base and Depth |
| Paver thickness by use | 2 3/8 in pedestrian, 3 1/8 in streets | 60 mm and 80 mm units; both are editable because makers sell 2 3/4 in and 3 1/8 in variants. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
| Edge restraint | at least 1 in of vertical face on the paver | ICPI minimum restraining surface; more for heavy-duty applications. | CMHA / ICPI PAV-TEC-002 — Construction of Interlocking Concrete Pavements |
This is an estimating tool. The product label, the paver manufacturer’s installation guide and your local building department decide the detail on your site — the numbers here are a starting point, and every price is an example you are expected to change.